Search
X Global announcement header

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed nibh augue, volutpat in finibus ac, bibendum non lectus. Aenean finibus nisi risus, lobortis lacinia ligula interdum id.

Opportunity

Mature Fields

Opportunity
Specific Challenge

Dependable long-term V0 downhole barrier for gas well

Region-Asia

Maylaysia

Region-Asia

Challenges

  • Dependable long-term V0 downhole barrier for gas well
  • Typical intervention barrier provision is short term,(days/weeks)
  • Retrievable long-term downhole API-11D1 V0 barrier provision

Solution

EV0-Trieve™ RBP

  • Review applicationfor metallurgy and elastomer compatibility with well conditions

Results

  • Provided six years of long-term, continuous, downhole barrier performance
  • Successfully recovered EV0-Trieve RBP using flow-release GS pulling tool
  • Recovered EV0-Trieve RBP in good condition, which allowed inspection and redress for future operations

Overview

An operator in Malaysia required the installation of a temporary intervention downhole well barrier in a gas well. Halliburton recommended a 5 1/2-in. EV0-Trieve™ retrievable bridge plug (RBP) for barrier provision.

Halliburton installed the RBP in November 2016, further to previous short-term installations. After six years of continuous well barrier service, Halliburton successfully recovered the plug in December 2022.

Challenge

Typical intervention barrier provision is short-term (days or weeks) to allow immediate maintenance operations. However, on occasion, there is a need for longer-term downhole barrier provision.

Solution

After in-depth technical assessment, the EV0-Trieve RBP was deemed the best solution to address the well challenges. Halliburton performed a full assessment of the application, which included a review of metallurgy and elastomer properties, to ensure compatibility.

6

years of long-term downhole barrier performance

2,231

days of well shut-in

Results

The EV0-Trieve™ RBP provided 2,231 days of continuous downhole barrier performance. The bridge plug was recovered in good condition, which allowed inspection and redress for future installations. The EV0-Trieve RBP demonstrated performance well beyond the standard for a gas-tight barrier for both short- and long-term applications.

Related resources

Thru-tubing intervention tools

Thru-tubing intervention tools

Customizable intervention solutions for wellbore remediation reduce well time and costs.

Explore
icon

READY TO TAKE THE NEXT STEP?

Talk with a Halliburton completion tools expert

get in touch