Search
X Global announcement header

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed nibh augue, volutpat in finibus ac, bibendum non lectus. Aenean finibus nisi risus, lobortis lacinia ligula interdum id.

Specific Challenge

Conformance Service for an oil producer in California

REGION - USA / CALIFORNIA REGION - USA / CALIFORNIA

Bakersfield, California

REGION - USA / CALIFORNIA

Challenge

  • Oil producer under cyclical steam injection (400°F) in Bakersfield, CA
  • Two upper zones were previously hydraulically fractured and operator wanted to permanently shut them off to improve production from lower intervals

Solution

  • RBP set to protect lower zones
  • Injectrol® NWB was bullheaded to isolate upper zone
  • Injectrol® NWB formulation was optimized for leakoff control against proppant pack (an increase of 300 psi was achieved during the treatment squeeze)

Result

  • Pressure integrity test showed total zonal isolation at the first attempt
  • Well is currently producing from lower zones

300

psi Increase

1st

Attempt Completed Isolation

icon

ready to take the next step?

Talk with a Halliburton expert

get in touch