Search
X Global announcement header

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed nibh augue, volutpat in finibus ac, bibendum non lectus. Aenean finibus nisi risus, lobortis lacinia ligula interdum id.

Specific Challenge

Scale Removal of a 13,000 ft well, allowing production to resume

REGION

Middle East

Challenge

  • Due to water production, acid insoluble scale accumulated, plugging a 13,000 ft well
  • Production decline had been observed due to the scale choking
  • Scale had also restricted the SSSV from working which posed a safety concern for any workover operation

Solution

  • Slow rotating Hydra-Blast® Pro service provided customized chemical packages, cleaning heads, and specialized software that predicted optimum nozzle, fluid and treatment selection

Result

  • Halliburton’s coiled tubing intervention solution was proposed as an alternative to changing the well completion - alternative option would have cost over $4MM with +/- 25 days of deferred production
  • Halliburton’s solution was executed in 5 days with a total cost (including the rig cost) of $1MM
  • No formation damage resulted as well was not killed
Zero

Formation damage

25

Days saved

3MM

USD saved

Related products

HydraBlast Pro™ slow rotating wash downhole tool

HydraBlast Pro™ slow rotating wash downhole tool

HydraBlast Pro™ is a slow rotating wash downhole tool with focused high-pressure jetting for scale and organic deposits removal

Explore
icon

Ready to take the next step?

Talk with a Halliburton well intervention expert

Get in Touch
icon

ready to take the next step?

Talk with a Halliburton expert

get in touch