Search
X Global announcement header

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed nibh augue, volutpat in finibus ac, bibendum non lectus. Aenean finibus nisi risus, lobortis lacinia ligula interdum id.

Opportunity

Deep Water

Opportunity
Specific Challenge

Resolve water cut in a horizontal completion in the North Sea

REGION

North Sea

Challenge

  • Depleted sandstone oil reservoir in the North Sea 
  • Horizontal completion with pre-pack screens 
  • BHT ~200°F 
  • Wellbore was eventually shut-in as the horizontal drain watered out, 100% watercut (WC)

Solution

  • Identify current water oil contact (WOC) 
  • Isolate production from pre-pack screens: Thermatek® 
  • Re-perforate above current WOC

Result

  • Watercut reduced by more than 90% 
  • The same process was successfully applied to four wells

4

Wells treated

90%

Reduction in water cut

icon

ready to take the next step?

Talk with a Halliburton expert

get in touch